General Management and Supervision of Construction Works PRISHTINA MALL
Name of assignment or project:
GENERAL MANAGEMENT AND SUPERVISION OF CONSTRUCTION WORKS FOR PRISHTINA MALL
Year: Jun 2019 – Mar 2023
Location: Kosovo
Client: Prishtina MALL
Main project feature:
The PRISHTINA MALL Building has 240.000,00 m2, in 4-levels
with 1100 indoor parking places and ~5000 outdoor parking place.
This project contains:
- Public Area 124.000,00 m2
- Leasing Area 115.000,00 m2
- Indoor Parking Area 54.000,00 m2 with 1.2000 parking place
- Outdoor Parking Area 73.000,00 m2 with 2.100 parking place
- Road with 4 lanes, L=3000m
- Stream storm water regulation 1.8 km (approximate value 270.000,00 €)
- Water treatment from 3-wells ~10.0 l/sec with energy-block building 1.100,00 m2, with 4-water tank whereas drink water tank 400 m3, Sprinkler 1200 m3, Hydrants 400 m2 and Service water 200 m3, all total 2200 m3.
IPE-PROING was appointed to supervise and manage the selected contractors. The works supervision is performed in accordance with Red FIDIC Conditions of Contract.