Detail design for Highway M9, Section: Prishtine -Kijeve L= 41km
One of the main ways for both freight and personal transport in the Kosovar territory is the M 9 road starting from capitol of Kosova – Prishtina and ends up to Peja in total length of 80 km. Ministry of Transport in 2007 decided to expand the capacity of this direction from single to dual carriageway. Three out of four LOTS are awarded to IPE PROING as following:
LOT 1: Prishtina – Fushe Kosova
L=5km year of award 2007, completion 2008
LOT 2: Fushe Kosova – Arrlat
L=25km year of award 2008, completion 2009
LOT 3: Arrlat – Kijeve
L=11.5km year of award 2009, completion 2010
First two LOTS are constructed in the period 2008-ongoing. Construction values for two LOT’s is above120 million Euro. These are the largest detail designs ever done by the Local Company for this kind of projects.
These projects contain:
- Underpasses – 7 pieces, with 2x14m=28m
- Overpasses – 3 pieces,
- Bridges – 5 bridges span 25m – 200m
- Intersections (Separate graded junctions) – 3 (roundabout with 4 ramps, trumpet and ameba type).
- Retaining walls – L = 2km H 2-9m
- Culverts – 12 pcs, 3-5m span.
The services provided by the consultant are:
Conceptually & Preliminary design
Preparing general data of design, Preliminary technical report, Detail surveying and geotechnical investigation, Geometrical |Design in three planes, preliminary design of junctions and interchanges
Preliminary design of drainage (internal and external), Preliminary design of structures, preliminary design of utilities, Preliminary bill of quantity.
Detail design containing: Technical report, Topo Survey data’s, geotechnical investigation report
Geometrical \ Design of Highway, Detail \ Design of Junctions and Interchanges, Detail Design of Drainages, Detail Design of Utilities, Detail Design of Road Marking and Road Ancillaries, Detail Design of all Concrete Structures such are:
- underpasses,
- overpasses,
- bridges,
- intersection structures,
- retaining walls and culverts,
- Bill of quantities for each part of detail design including necessary reports, technical specifications for each part of the design including necessary standard applications.
In all three LOTS, there are prepared also:
- Land Acquisition project
- Health and Safety elaborate
- Environmental protection elaborates etc.
For some of the bridge structures bridge load testing has been performed by IPE-PROING Laboratory team and equipment’s.
Investor: Ministry of Transport Government of Kosova.