Detail Design Central Ringroad of Prishtina, Western Part
Detailed description of project
Detail Design of separate graded roundabout connecting two motorways M2&M9 Prishtina-Fushe Kosovo, Pristina- Mitrovica and western part of inner ring of Prishtina town – Investor Ministry of Transport Government of Kosova & Municipality of Prishtina.
M2&M9 are intersecting at the western part of Pristina Town. Ministry of Transport requested an innovative solution for this intersection. IPE PROING has been pointed out to provide a design solution for this intersection. Separate graded roundabout has been proposed and accepted. The innovative part of this design is 5 flag rounds about as unique solution for the place where was design/built. External diameter for this round about is 100m and inner diameter is 90, Carriageway width is 20m. This roundabout contains four ramps, 2 on ramps and 2 off ramps. With length, up to 200 m.
Furthermore, western part of inner ring was part of this contract financed by municipality of Prishtina length of this road is 2.5 km, and the design is for dual carriageway.
This road contains:
- Roundabout – diameter 50 m
- Bridges – 2 bridges L=200 m
Type and scope of services provided
Preliminary design
Preparing general data of design, Preliminary technical report, Detail surveying and geotechnical investigation, Geometrical Design in three planes, Preliminary design of bridge structures of roundabout, Preliminary design of drainage (internal and external), Preliminary design of structures, preliminary design of utilities, Preliminary bill of quantity.
Detail design containing:
- Technical report, Topo Survey data’s
- Geotechnical investigation report
- Geometrical design of highway
- Detail design of bridge structures of roundabout
- Detail design of drainage
- detail design of utilities,
- detail design of road marking and road ancillaries,
- Bill of quantities for each part of detail design including necessary reports,
- Technical specifications for each part of the design including necessary standard applications.
There are prepared also:
- Land Acquisition project
- Health and Safety elaborate
- Environmental protection elaborates etc.
Also, the bridge structures load testings has been performed by IPE-PROING Laboratory team and equipment’s.
Investor: Munacipality of Pristina
Year: 2008-2009